Just to share with you guys! Interior trims have been installed, pending for the installation of sunroof and my Works Engineering gauges for interior items.
Now, the car is pending for:
(1) Installing Evo 3 intercooler and it’s piping.
(2) Retrofitting the Wira SE front bumper to fit nicely and hide the Evo 3 intercooler and piping that’s sprayed black in colour.
(3) Fitting the rear Wira SE bumper+skirts+number plate holder.
(4) Installing 2.5 inch exhaust piping, with 2 bullets and 1 S-Flow muffler.
(5) Tuning the adjustable BC Racing V1 (front 6k / rear 4k) to street conditions, likely on softer side.
(6) Tuning the fuel mapping and power band via E-Manage Blue piggyback for 1.0 bar of boost utilizing Ron95.
(7) Endorse the car, obtain legal roadtax and insurance to go on the road.
(8) Get the sunroof done with A+B+C pillar wrap with black fabric.
(9) Get the Works Engineering gauges installed.
(10) Paintjob.
(11) Install keyless entry and push-start Epsilon.
(12) Install JBL sound system (6 speakers, 2 tweeters, 1 processor cum amplifier) and Pioneer player.