yup back to finishing my job...fyi, i not eat full, sell pao, i work night shift. Got ample time indeed.
Go to tesco, finally managed to get the enclose plastic box i want. 22 litre one. 12 bucks.
Height of the box is 9". Dont use higher. Later cannot close the boot. :hmmmm:
Go stationary section, get ruler. Hahaha.,..
i was so worry. Anyway luck on my side.
Yeah, again dive in take out wira tray and fit into new box.
![DSC_0276.jpg DSC_0276.jpg](https://www.zerotohundred.com/forums/data/attachments/174/174343-e98ab6e68f15d0198b0777351da3def7.jpg)
Dive again, screw the tray and box together. And also my diy battery holder too (i use back from engine bay).
Battery holder is piece metal, i use 3 layer heat shrink tubes.
![DSC_0278.jpg DSC_0278.jpg](https://www.zerotohundred.com/forums/data/attachments/174/174345-68b3ce244f5bbbb6a2bb237a48b0237e.jpg)
Battery in, tighten everything. Red tape is acrylic tape from tesco too. 2 rolls. To ensure minimal gas leakage.
Air tube to vent out excess gas.
![DSC_0280.jpg DSC_0280.jpg](https://www.zerotohundred.com/forums/data/attachments/174/174346-09ade456797fc206e1c471ef3692e217.jpg)
![DSC_0282.jpg DSC_0282.jpg](https://www.zerotohundred.com/forums/data/attachments/174/174348-a643145cf6ebaf9ba051caa24a20e69e.jpg)
There you have it. Complete project.
![DSC_0281.jpg DSC_0281.jpg](https://www.zerotohundred.com/forums/data/attachments/174/174347-d56a4617a3666034c8f90f5ced2aeb3f.jpg)
As you see the grounding, 4 welding spot. Do not drill hole there, is a frame. Cannot tighten bolts/nuts inside the frame....
Thanks for all the feedback. Dear sifu/otai/king.![Biggrin :biggrin: :biggrin:](https://zerotohundred.com/forums/styles/default/xenforo/smilies/biggrin.gif)
Will get bigger venting tubes, maybe 10-12mm after CNY.
Go to tesco, finally managed to get the enclose plastic box i want. 22 litre one. 12 bucks.
Height of the box is 9". Dont use higher. Later cannot close the boot. :hmmmm:
Go stationary section, get ruler. Hahaha.,..
i was so worry. Anyway luck on my side.
Yeah, again dive in take out wira tray and fit into new box.
![DSC_0276.jpg DSC_0276.jpg](https://www.zerotohundred.com/forums/data/attachments/174/174343-e98ab6e68f15d0198b0777351da3def7.jpg)
Dive again, screw the tray and box together. And also my diy battery holder too (i use back from engine bay).
Battery holder is piece metal, i use 3 layer heat shrink tubes.
![DSC_0278.jpg DSC_0278.jpg](https://www.zerotohundred.com/forums/data/attachments/174/174345-68b3ce244f5bbbb6a2bb237a48b0237e.jpg)
Battery in, tighten everything. Red tape is acrylic tape from tesco too. 2 rolls. To ensure minimal gas leakage.
Air tube to vent out excess gas.
![DSC_0280.jpg DSC_0280.jpg](https://www.zerotohundred.com/forums/data/attachments/174/174346-09ade456797fc206e1c471ef3692e217.jpg)
![DSC_0282.jpg DSC_0282.jpg](https://www.zerotohundred.com/forums/data/attachments/174/174348-a643145cf6ebaf9ba051caa24a20e69e.jpg)
There you have it. Complete project.
![DSC_0281.jpg DSC_0281.jpg](https://www.zerotohundred.com/forums/data/attachments/174/174347-d56a4617a3666034c8f90f5ced2aeb3f.jpg)
As you see the grounding, 4 welding spot. Do not drill hole there, is a frame. Cannot tighten bolts/nuts inside the frame....
Thanks for all the feedback. Dear sifu/otai/king.
![Biggrin :biggrin: :biggrin:](https://zerotohundred.com/forums/styles/default/xenforo/smilies/biggrin.gif)
Will get bigger venting tubes, maybe 10-12mm after CNY.
Attachments
Last edited: